Graywood Major Design Review Application
To: Chairman, New Construction Committee
Builder: ___________________________________________________________
Owner: ____________________________________________________________
Lot: _______________________________________________________________
Date: ______________________________________________________________
This Submittal is for:
____________ New Construction
____________ New Additions to existing structure
Has floor plan been previously approved for another lot? __________________________
If yes, for which Lot? __________________________
Is elevation style substantially different? __________________________
Air Conditioned Space (1st floor) __________________________
Air Conditioned Space (2nd floor) __________________________
Total Net Square Footage __________________________
Covered Porches __________________________
Garage/Storage __________________________
Other: __________________________
Total Gross Square Footage __________________________
Owner
Name: |
|
Street: |
|
City: |
|
State: |
|
Zip: |
Phone: |
|
Builder
Name: |
|
Firm: |
|
Street: |
|
City: |
|
State: |
|
Zip: |
Phone: |
|
Architect
Name: |
|
Firm: |
|
Street: |
|
City: |
|
State: |
|
Zip: |
Phone: |
|
Landscape Architect
Name: |
|
Firm: |
|
Street: |
|
City: |
|
State: |
|
Zip: |
Phone: |
|
Lender
Name: |
|
Firm: |
|
Street: |
|
City: |
|
State: |
|
Zip: |
Phone: |
|
General Information
Lot Dimensions: _______________________________________________________________
Lot Sq. Ft.: ___________________________ Stories: _________________________________
Bedrooms: ___________________________ Baths: __________________________________
Height from Slab: _____________________________________________________________
Height from crown of road to roof ridge: ___________________________________________
We propose to commence on or about: ____________________________________________
The following documents are provided herewith in four sets as required by The Graywood New Construction Committee.
____________________________ Major Design Review Application
____________________________Final Site Plan
____________________________Final Floor Plan
____________________________Final Exterior Elevations
____________________________ Final Building Details
____________________________ Exterior Colors/Finishes/Materials
____________________________ Final Landscaping and Irrigation Plans
____________________________ Cost Estimate
____________________________ Construction Schedule
____________________________ Builder Qualifications
____________________________ Application fee of $250.00
____________________________ Contractor Deposit of $1000.000/ Home Owner Deposit of $2000.00
Colors
(Provide Chips)
|
Body/Siding |
Trim |
Doors |
Shutters |
Garage: ____________________________________________________________________
Door Window Schedule: _______________________________________________________
Roof: ______________________________________________________________________
Brick (Name or Sack):__________________________________________________________
Payable to: GRAYWOOD NEW CONSTRUCTION COMMITTEE
NOTE: If you feel there are any unusual items that require specific attention, please state above.
No occupancy of the residence is permitted until all construction and landscaping is complete in accordance with the plans, drawings, specifications, and landscape information approved by the NCC.
____________________________ ______________________________
Owner Date
____________________________ ________________________________
Builder Date
Committee Use
Date Received: ________________________________________________________________
The New Construction Committee has reviewed the foregoing application and rendered the following decision:
_________________ Approved
_________________ Approved with limiting conditions
_________________ Denied
Comments (recommendations):
Limiting conditions to be approved prior to construction:
____________________________________
Chairman/ New Construction Committee
____________________________________
Date
Time Limitations:
After the initial and major review and approval by the Committee, the Participating Builder must begin construction within six (6) months from the date of approval, or forfeit all approvals. In that event, a new application must be submitted and approvals obtained before commencement of construction. In any event, construction must be completed within twelve (12) months of commencement.