Survey/ Certificate of Occupancy/ Construction Deposit
Upon completion of construction the following will be submitted to the NCC:
- Final Survey showing as-built conditions of the following:
Lot corners
Dwelling
Driveways and driveway aprons
Sidewalks and walkways
Pools, decks, and patios
Fences
Easements and right-of-ways
Elevations for ground floor of residence
- Certificate of Occupancy
- Upon receipt of the above items and final inspection by the Committee to ensure compliance with all Committee criteria and policies, the Committee will return the participating builder’s construction deposit. All deposits will be returned less any deduction required by the developer to satisfy the standards as set forth in the Design Guidelines.
Modifications Committee
A Modifications Committee (MC) may also be appointed by the Board of Directors or the Master Developer. The MC shall consist of at least three (3) and no more than five (5) members. The MC shall have exclusive jurisdiction over modifications, additions, or alterations made on or to existing residences or structures in accordance with the Covenants, Conditions, and Restrictions.
The Modification Committee (MC) has deamed at this time to make an alteration in accordance with the covenants, conditions, and resolutions. All exsisting home modifications in excess of $2500 will be subject to a $50 non-refundable evaluation fee and a refundable $500 construction deposit. The construction deposit will be refunded upon a Graywood final inspection and approval of said modifications.
In addition to this language landscaping is also part of this modification. Also when the homeowner(s) landscaping goes through the approval process it is at that time deamed approved for that contractor. If that changes, another draw must be submitted for approval and a $50 fee for the process of that recommendation or any other.